Aiag Cqi-11 Pdf [verified] May 2026

AIAG CQI-11 Special Process: Plating System Assessment is a comprehensive self-assessment standard developed by the Automotive Industry Action Group (AIAG). It is designed to evaluate, control, and improve plating management systems within the global automotive supply chain, ensuring consistent quality and defect prevention. Purpose and Scope The primary goal of CQI-11 is to foster continual improvement

by emphasizing defect prevention and the reduction of variation and waste. It provides a standardized approach for suppliers to self-assess their electroplating processes—such as zinc, nickel, and chrome plating—to meet strict OEM requirements. Who it's for

: All automotive suppliers globally that utilize electroplating processes for metal or plastic components.

: It is often a "customer-specific requirement" that acts as an appendix to the IATF 16949 quality standard. Công ty Tư vấn ISO VINTECOM Quốc tế Structure of the Assessment (3rd Edition) aiag cqi-11 pdf

The latest version (3rd Edition, released in 2019) includes updated process tables and an optional "Form Builder" tool for a tailored assessment. The document is generally divided into four main sections: CQI-11 | Special Process: Plating System Assessment - AIAG

The CQI-11 Special Process: Plating System Assessment is a key AIAG (Automotive Industry Action Group) document. If you are asking for a feature related to the CQI-11 PDF (the standard document itself), here are its notable features:

  1. Structured Plating Process Audit: The PDF provides a standardized checklist to audit both electroplating and electroless plating processes (e.g., zinc, nickel, chrome, anodizing, phosphate coating).
  2. Three-Tier Assessment Process:
    • Section 1 – Plating Process Survey: General facility and quality system questions.
    • Section 2 – Process Table: Detailed process-specific requirements (pre-treatment, bath chemistry, temperature, current density, etc.).
    • Section 3 – Action Plan Log: A built-in table to track nonconformities, root causes, and corrective actions.
  3. Embedded Rating System: The PDF contains a scoring methodology (per question: Acceptable, Unacceptable, Not Applicable) to calculate a final Plating System Assessment score.
  4. Reference to Plating Process Tables (A–M) : Includes specialized tables for different plating types (e.g., Table A for Zinc, Table G for Hard Chrome, Table L for Electroless Nickel).
  5. Interactive Fillable Fields (depending on version): Many paid PDF versions include editable form fields for checkboxes, scores, and notes—allowing direct digital completion without printing.
  6. Mandatory Process Control Logic: Emphasizes pyrometry (furnace temperature uniformity testing) if plating involves heat treatment post-plate, plus laboratory testing for bath analysis frequency.
  7. AIAG Alignment Feature: Cross-references with IATF 16949 requirements and customer-specific plating standards (e.g., CQI-11 v4 integrates new requirements for traceability, maintenance, and process capability).

⚠️ Note: The full CQI-11 PDF is a copyrighted document sold by AIAG (usually $350–$450 USD). I cannot provide or reproduce the PDF. If you need the official document, you can purchase it from AIAG’s website. AIAG CQI-11 Special Process: Plating System Assessment is

If instead you meant features of a plating management software tool that helps with CQI-11 compliance, let me know and I can clarify those separately.

The AIAG CQI-11 Special Process: Plating System Assessment is a globally recognized standard for evaluating and enhancing plating processes within the automotive supply chain. As a supplement to IATF 16949, this assessment focuses on standardized, continuous quality improvement through key components like process tables, job audits, and equipment management. For more information, visit AIAG. Automotive Quality Solutions CQI-11 – How to Nail Your Plating Process Assessment


3. Version Control (The Real Need)

The automotive industry evolves rapidly. Suppliers need to know if they are using the 3rd Edition (current standard), the 2nd Edition, or the 1st Edition. Search engines often index old, obsolete PDFs. A verified digital PDF allows you to confirm the revision level immediately. Structured Plating Process Audit : The PDF provides

Step 3: Hydrogen Embrittlement (HE) Control

CQI-11 is ruthless regarding HE. You must demonstrate:

  • Post-plating baking within 4 hours (unless exempt).
  • Tensile testing per ASTM F519.
  • Traceability of racks and batches. The PDF provides the specific forms (Form 3 & 4) to log this data. Copy these forms from your PDF and laminate them for shop floor use.

Common Mistakes When Using CQI-11

Based on thousands of real-world audits, here are the top 5 failures suppliers make, even with the PDF in hand:

  1. Treating it as a checklist, not a system. Auditors ask "Show me." If you check "Yes" on training but can’t produce training records from the last 12 months, you fail.
  2. Ignoring Hydrogen Embrittlement (Section VI). Many platers think baking only applies to high-strength steel (>36 HRC). Wrong. CQI-11 requires baking for all hardened parts unless proven otherwise by specific testing.
  3. Out-of-date process tables. If your PDF is from 2012, you are using obsolete chemistry limits. Always use the 3rd Edition (2019) or newer.
  4. No evidence of management review. Section I requires top management to review plating performance. A signature from a foreman doesn't count.
  5. Forgetting the "Continuous" part. CQI-11 requires a full reassessment every 12 months. Filing last year’s assessment and not changing anything until the next audit is a violation.

Implementing the CQI-11 Assessment System (Beyond the PDF)

Having the PDF is 10% of the battle. The other 90% is execution. Here is a step-by-step guide to deploying CQI-11 in your plating operation.

Additional Information