Here’s a concise review of the PWD Schedule of Rates (SoR) 2018–19 for Karnataka (PDF version), based on common feedback from contractors, engineers, and government departments.
⚠️ Limitations / Complaints (2018–19 edition)
- No price escalation – Rates are fixed for the financial year; doesn’t account for post-2018 inflation (especially steel, cement, diesel).
- District variations missing – SoR is uniform across Karnataka, but actual material/labour costs differ (e.g., Bengaluru vs. Bidar).
- Labour rates underreported – Skilled labour rates in SoR were often lower than market wages in 2018–19.
- No machinery/productivity updates – Equipment output assumptions may be slower than current construction practices.
- PDF formatting issues – Some scanned copies are non-searchable, missing bookmarks, or have illegible tables.
Changes from 2017-18 vs. 2018-19
When analyzing the 2018-19 PDF, engineers look for the percentage increase from the previous year. Notable changes in that financial year included:
- GST Impact: 2018-19 was the first full year after the rollout of GST (July 2017). The SoR explicitly w.e.f. April 1, 2018, adjusted rates to reflect the new tax regime, removing cascading taxes (VAT, Service Tax) and replacing them with GST slabs (5%, 12%, 18%).
- Steel Fluctuation: A global increase in steel prices in late 2018 led to a mid-year correction note (usually an addendum to the PDF).
- Green Building Materials: The 2018-19 SoR introduced specific rates for Autoclaved Aerated Concrete (AAC) blocks and Fly ash bricks, responding to environmental mandates.
Contents & Structure
- Division-wise rates: Covers all 30+ PWD divisions (Bengaluru, Belagavi, Hubballi, etc.) with localized material & labour costs.
- Item categories: Earthwork, concrete, reinforcement, formwork, brick/block masonry, flooring, roofing, plumbing, painting, road works (BT/CC), sanitary, and electrical.
- Basic rates: Includes cost of materials, carriage, labour (with daily wages as per GoK norms), and contractor’s overheads + profit (~15–20%).
- Analysis of rates: Detailed break-up for key items (e.g., 1:2:4 PCC per cum) – useful for re-rationing.
Rating
⭐⭐⭐☆☆ (3/5) – Outdated but authoritative for its period.
The Karnataka Public Works Department (PWD) Schedule of Rates (SR) 2018-19 serves as the primary technical document for estimating costs and preparing tenders for government construction projects across the state. It establishes standardized rates for labor, materials, and machinery usage to ensure consistency and transparency in public spending. Key Components and Framework
Administrative Oversight: The 2018-19 SR was drafted by a 13-member committee chaired by the Managing Director of Krishna Bhagya Jala Nigam Ltd (KBJNL).
Foundation of Rates: While technical specifications from the 2016-17 SR were largely retained, rates were updated based on current market costs for cement, steel, and fuel.
Labor and Wages: Rates include revised minimum wages and updated variable dearness allowance (VDA).
Overhead and Profit: Standard provisions include 10% for Overhead Charges (covering supervision, site offices, and quality control) and 10% for Contractor’s Profit.
Cost Calculations: Rates are generally inclusive of materials, labor, machinery hire, royalty, and transportation (lead and lift), but typically exclusive of GST, which is added separately to estimates (often at a rate of 12% for this period). Technical Highlights
Material Provisions: Specific focus was placed on the use of Manufactured Sand (M-Sand) to discourage river sand mining.
Quarterly Updates: The document allows for quarterly updates to the cost of volatile materials like cement and steel to account for market fluctuations.
Machinery Hire: Hire charges were recalculated based on variations in the Wholesale Price Index (WPI) for construction and mining machinery.
Interest Rates: The rate of interest on capital cost for machinery was reduced from 11% to 9% for this cycle. Document Structure pwd schedule of rates 2018-19 karnataka pdf
The SR is typically divided into chapters covering specific construction categories: SCHEDULE OF RATES
SCHEDULE OF RATES. Page 1. WATER RESOURCES DEPARTMENT. GOVERNMENT OF KARNATAKA. Govt Order No. WRD 146 KBN 2017, BENGALURU Dt: 21-
ಕೃಷ್ಣ ಭಾಗ್ಯ ಜಲ ನಿಗಮ ನಿಯಮಿತ
Public Works Department Schedule of Rates for Buildings 2021
A very specific request!
After conducting a thorough search, I was able to find a relevant document related to the PWD Schedule of Rates for Karnataka, India. Here is a summary of the paper:
Title: PWD Schedule of Rates 2018-19 Karnataka
Document Type: PDF
Source: Public Works Department, Government of Karnataka
Summary:
The PWD Schedule of Rates 2018-19 Karnataka is a comprehensive document that outlines the rates for various construction materials, labor, and services for the public works department in the state of Karnataka, India. The schedule is published annually and is used as a reference for estimating costs for various infrastructure projects.
The document provides a detailed list of rates for: Here’s a concise review of the PWD Schedule
- Materials:
- Building materials (e.g., cement, sand, aggregate, bricks)
- Road construction materials (e.g., bitumen, aggregates)
- Electrical materials (e.g., wires, cables, electrical fittings)
- Labor:
- Daily wages for various skilled and unskilled laborers
- Labor rates for specialized tasks (e.g., welding, painting)
- Services:
- Rates for various services, including transportation, loading, and unloading
The schedule is divided into several sections, including:
- General conditions
- Materials
- Labor
- Services
- Appendices
Key Features:
- The document provides a comprehensive list of rates for construction materials, labor, and services.
- The rates are effective from April 1, 2018, to March 31, 2019.
- The schedule is used as a reference for estimating costs for various infrastructure projects in Karnataka.
Download Link:
You can download the PWD Schedule of Rates 2018-19 Karnataka PDF from the official website of the Public Works Department, Government of Karnataka: www.pwd.karnataka.gov.in
Alternatively, you can also search for the document on online repositories or government websites, such as:
Relevance:
The PWD Schedule of Rates 2018-19 Karnataka is an essential document for:
- Construction companies and contractors working on infrastructure projects in Karnataka
- Government agencies and departments involved in public works projects
- Architects, engineers, and estimators involved in project planning and execution
Please note that the rates mentioned in the document are effective only for the specified period and may not be applicable for current projects.
Karnataka Public Works Department (PWD) Schedule of Rates (SR) for 2018-19
is a critical regulatory document used for standardizing construction costs across state infrastructure projects. It serves as the benchmark for estimating, tendering, and auditing public works including buildings, roads, and bridges. Accessing the 2018-19 Schedule of Rates
While the state periodically updates these volumes, the 2018-19 editions remain relevant for historical auditing and ongoing projects initiated during that fiscal period. You can find digital copies through the following sources: Official Karnataka PWD Portal
: The department maintains an archive of various volumes. Check the KPWD Downloads section for building-specific data. Krishna Bhagya Jala Nigama Limited (KBJNL) : Provides the Water Resources SR 2018-19 ⚠️ Limitations / Complaints (2018–19 edition)
, which was prepared by a specialized committee to include updated material and labor costs. Circle-Specific Documents
: Rates are often released by specific administrative circles. For instance, detailed spreadsheets and PDFs exist for the Dharwad Circle Mysore Circle Key Components of the 2018-19 SR
The 2018-19 schedule introduced or maintained several critical financial structures: Labor & Material Indexing
: Minimum wages were updated based on the state's annual average CP index for industrial workers. Operational Overheads : A standard 10% overhead charge 10% contractor's profit
were generally factored into the finished rates for building items. Taxation (GST)
: While older rates were inclusive of various taxes, subsequent government orders (like PWD 51 RDF 2019) began requiring GST (typically 12% at the time) to be added separately to estimates. Standardization : The specifications align largely with the CPWD (Central Public Works Department)
guidelines, covering everything from excavation and mortar mixes to specialized firefighting and electrical components. Importance in Governance
By providing a uniform "price list" for every unit of work—from a cubic meter of cement mortar to a hectare of jungle clearance—the SR prevents arbitrary pricing in government contracts. It ensures that whether a project is in Bangalore or a remote hill station (which might receive an area weightage
of up to 20-25% for difficult terrain), the financial foundation is transparent and equitable. Karnataka PWD Schedule of Rates 2018-19 | PDF - Scribd
How to Download the Authentic PWD Schedule of Rates 2018-19 Karnataka PDF
Unlike Central PWD (CPWD) documents, Karnataka PWD does not always keep very old SoRs easily accessible on their main homepage. However, the authentic digital copies are maintained on the official Karnataka PWD e-Procurement Portal and the Karnataka Government Data Centre.
Step-by-Step Download Guide:
- Official Source: Navigate to the official Karnataka PWD website (keralapwd.gov.in – Note: While similar, ensure you are on Karnataka domain. The correct portal is often linked via kpwd.karnataka.gov.in).
- Manuals & Codes Section: Look for the tab labeled "Manuals / Standards / SoR."
- Archives: Since 2018-19 is historical, search for an "Archive" or "Previous Year SoR" link.
- Direct Search (Alternative): Use a government-authorized repository. The most reliable direct link often comes from the Karnataka State Nirmathi Kendra (KSNK) , which publishes the "Analysis of Rates."
Disclaimer: Direct third-party hosting of government PDFs is illegal. Always verify you are downloading a PDF file ending in .gov.in.
If the official link is temporarily moved, look for the file name convention: Typically, the file is named SoR_2018-19_KPWD.pdf or Rate_Analysis_2018_Karnataka.pdf.
Who should use it?
- Government engineers – For verifying bills of old contracts (pre‑2020).
- Arbitrators & advocates – In disputes where SoR 2018–19 is the agreed basis.
- Students/researchers – Studying cost escalation trends in Karnataka PWD.
Avoid if you need current bid estimates, DSR 2023–24, or CPWD/DAR rates.